Our Mortise and Tenon Style stairway comes fully assembled for less on-the-job assembly. All posts and railings come pre-drilled and pre-assembled so the owner just has to insert railing sections and secure with the hardware we provide. The photos below show just how easy installation is.
|
Step 1: Hoist stairs into place. |
Step 2: Place the stairs so that the top of |
|
Step 3: Level the stairs |
Step 4: Attach the stringers to the floor system |
|
Step 5: Check level again. |
Step 6: Temporary ground-level footing |
|
Step 7: Attach posts at base of stairway. |
Step 8: Plug countersink holes with plugs |
|
Step 9: Attach the first angled stair rail |
Step 10: Attach the rail to the post |
|
Step 11: Sometimes the railing ends need to be cut on site. Grind the ends until they are smooth. |
Step 12: Attach railings on side two. |
|
Step 13: Attach rail to post with provided hardware. |
You're done! Step 14: Stand back and admire your work. |
|
A final look at the completed stairway |
|
![]() |
|